OINNet — Online International News Network

Bali Waste-to-Energy Plant Construction at 26 Percent Complete

Indonesian minister inspects progress on facility aimed at reducing landfill waste and generating electricity.

Authenticity Score: 75/100 across 1 source(s). First reported: 2026-11-25T10:52:26Z. Updated: 2026-11-25T10:55:52Z.

Indonesia's Coordinating Minister for Food Affairs Zulkifli Hasan inspected construction of Bali's waste-to-energy plant, now 26 percent complete. The facility is part of national efforts to convert landfill waste into electricity.

Verified Key Facts

Indonesian Coordinating Minister for Food Affairs Zulkifli Hasan conducted an inspection of a waste-to-energy plant under construction in Bali, where work has reached 26 percent completion, according to state-run Antara News.

The facility represents part of Indonesia's broader strategy to address municipal waste through energy conversion infrastructure. Waste-to-energy plants are designed to reduce landfill volume while generating electricity from refuse that would otherwise decompose in open dumps.

No completion date, projected capacity, or investment figures were disclosed in the available report.

Corroborating Sources